• Client Login
  • Report a Leak

Commercial Roofing in North Temple Corridor, Salt Lake City, UT

A ceiling tile that stays damp for a week after the surface above it looks dry usually means water is sitting in the insulation, not that the leak is still open. North Temple in Salt Lake City, UT is a project-area corridor that connects downtown toward the airport and carries the TRAX airport line, and the city promotes transit-oriented development and mixed-use infill along it. Infill matters to a roofer because new buildings rise against old ones, and the place where two roofs meet is where snow and water collect. A corridor walk starts at the outlets, climbs to the seam, parapet base or bowl behind the water, and records what is sound, what has moved and which test would answer the question.

Roof-walk notes: where new meets old

When a mixed-use building is added beside an older commercial one, the two roofs end up at different heights with a wall between them and a gutter, scupper or valley at the meeting point. Snow slides or blows from the higher roof onto the lower and leaves a drift against the wall. Melt from that drift runs along the flashing line and finds any gap. We look at the base flashing along the shared wall, the membrane turn-up, the counterflashing above it and the scupper or drain that is meant to carry the water away.

We also ask whether the lower roof was built to take the extra snow that lands on it, because the strip of membrane under a drift sees weight, moisture and ice in one place for weeks. Where a flashing has pulled away or a sealant joint has split, we sketch it and say whether it is a simple patch or evidence that the whole wall base needs new flashing and penetration work.

A scupper that discharges onto a neighbor's roof or a sidewalk is the other joint worth tracing. Water that leaves one building can become another building's ponding or a sheet of ice at an entrance, so we note where each outlet lands and what happens to the water when it arrives. The fix may be a short extension, a splash pad on the lower membrane or a conversation between two owners, and the photographs make that conversation shorter.

What failed first: the joint, not the field

On a commercial roof the middle of a membrane tends to outlast the places where it is cut, folded or fastened. The first failures we record on corridor buildings are usually a seam lap that has opened along a run, a corner where a flashing was formed in place and has split, a cracked sealant bead at an edge, or a curb where the turn-up has shrunk away from the wall. Coping joints that have loosened and drain bowls holding debris belong on the same list.

None of that shows in a photograph taken from the ground. A drone roof inspection can survey a large roof quickly and mark the spots worth a closer look, and a hands-on walk confirms them with a probe and a moisture reading.

Drainage and melt: the valley's winter on a flat roof

Repeated snowfall, a freezing cold season and warm summers in the Salt Lake City airport's record explain the pattern checked after every melt: where did the water go, and did it refreeze on the way? A drain bowl that fills with ice during a freeze cannot take the next thaw, and the water backs up over the nearest seam. A scupper does the same at the edge. On a building with a rooftop mechanical yard, curb corners and equipment pads add more places for snow to pile.

Heat is the other half of the year. A dark membrane in direct sun runs well above air temperature, stretches by day and draws back at night, and the same laps and corners take that movement over and over. A heat and UV repair is often the story of many small cycles, not one event.

Repair line: how far the patch should reach

A patch holds when the membrane around it is sound enough to bond to. When leaks return to the same zone, when insulation is wet or when the deck is soft, the repair line moves outward. The boundary goes on paper with its reason and a list of what we could not see. Cost and timing follow the layers on the roof, the amount of wet insulation, the penetrations, how the roof is reached and what the space below is used for.

If a building near the TRAX line has neighbors on three sides, crane or lift access changes the schedule more than the square footage does. We price a repair and a replacement from the same findings so an owner can compare them directly, and if the roof is a candidate for a recover, we open a test area first, because an extra layer adds weight and can bury wet insulation.

Seasonal timing: street work and train schedules

A corridor with a rail line and street improvements has its own rhythm of lane closures, platform activity and delivery windows. We ask the manager about them first and choose lift positions and truck times that stay out of the way, then bring material in small loads and stage it on the roof or in a fenced corner beside the building. Adhesives and welds have temperature limits, and nothing is opened that cannot be dried in before the crew goes home.

Owners with other holdings can bring them to the same visit, for example buildings in the Depot District or the Central Business District.

Street improvements add one more variable. Work at the curb can close a lane for a week, move a bus stop or change where a lift can park, and a roofing schedule that ignores it can stall at the sidewalk. We ask for the dates the manager knows about, state the assumptions in the proposal and revise the plan, with a dated note, if the street schedule moves.

Next check: what to send ahead of the walk

To place each finding, we use a roof sketch, the dates and rooms of any leaks, invoices for earlier repairs and the state of the lease or sale. A building with ground-floor retail and offices above is easier to plan when we know which tenants have to stay open and which entrances stay clear. Property managers who handle several buildings across Salt Lake City can book them on the same day.

Commercial Roofing Questions

Why does the wall between two roofs leak first?

Snow drifts against it and melts along the flashing line. Any gap in the base flashing or counterflashing gets a steady supply of water, so that joint takes the most punishment.

Can a lower roof beside a taller one be damaged by sliding snow?

It can. Slid snow adds weight and ice to one strip of membrane and can bend edge metal. We check the strip below a taller roof for crushed seams, bent metal and blocked drains.

Does transit-oriented infill change how we plan the work?

It changes access. Nearby construction and rail activity affect where a lift can stand and when trucks can arrive, so we settle those with the manager before a date is set.

Is a drone survey enough to price a replacement?

It finds suspect areas fast, but pricing needs a hands-on walk and, where wet insulation is possible, a moisture survey or a core. The drone picture tells us where to look.

What should a manager photograph before the visit?

The stain with the date, any visible water at the wall base and the view of the lower roof from a window, if one exists. Those give the first walk a place to start.

Request a Roof Assessment

North Temple Corridor, Salt Lake City in West Jordan, UT

Tell us where the water showed up

Share the room or roof section, the day the leak appears and how the crew would reach the roof. We will follow the likely water path and set the next test or repair boundary from there.

ServicesRoof SystemsIndustriesProperty TypesService AreasDamage RepairCapabilitiesManufacturersContactAboutRequest a Roof Assessment555-555-5555
Call555-555-5555